Paragon pipeline
  • Home
  • About
  • Projects
    • Alabama >
      • Honda - Lincolnville, Alabama
    • Georgia
    • Florida
    • North Carolina
    • South Carolina >
      • Storm Drain For Boeing
      • Gravity Sewer - Charleston, SC
      • Waterline - Charleston, SC
      • Electrical Line Bore - Charleston, SC
  • Gallery
  • Contact Us

HONDA - LINCOLVILLE, ALABAMA


INSTALLATION OF A STORM DRAIN AT THE HONDA PLANT IN LINCOLNVILLE, ALABAMA

140 feet, 90 inch casing
Boreshead
Bore was installed with a 40 foot joint.
Contractor: John Plott Co. ​
Paragon Pipeline
1170 HWY 16 E
Newnan, GA 30263
(770) 251-6353
Picture
Picture
Picture

​Site powered by MadeSimply
RECENT PROJECTS
​
Storm Drain, Boeing
Charleston, South Carolina

Gravity Sewer
Charleston, South Carolina

Waterline
Charleston, South Carolina
METHODS
​
Boreshead: range: 48 inch to 96 inch diameter
Conventional Auger Boring: range: 12 inch to 72 inch diameter
Guided Boring Machine: range: 6 inch to 72 inch diameter

Hand Mining
Pilot Tube Boring
We have extensive experience in hand mining, boreshead, conventional auger boring and pilot tube boring. We do turn-key operations from digging the bore pit, supplying the casing to installing your carrier pipe if requested.
HOME | ABOUT | PROJECTS
GALLERY | CONTACT US

  • Home
  • About
  • Projects
    • Alabama >
      • Honda - Lincolnville, Alabama
    • Georgia
    • Florida
    • North Carolina
    • South Carolina >
      • Storm Drain For Boeing
      • Gravity Sewer - Charleston, SC
      • Waterline - Charleston, SC
      • Electrical Line Bore - Charleston, SC
  • Gallery
  • Contact Us