SOUTH CAROLINA
Methods: GBM (Guided Boring Machine), Boreshead, Conventional Boring
Charleston, South Carolina
Boeing Storm Drain 170' of 66" pipe Method: GBM Contractor: O. L. Thompson |
Charleston, South Carolina
Gravity Sewer 48" casing, 460' Method: Boreshead Contractor: O.L. Thompson SubContractor: Tideland |
Charleston, South Carolina
Waterline 24" casing, 460' Method: Due to the size of bore and distance, Paragon Pipeline used GBM method to ensure grade and alignment. Contractor: O.L. Thompson SubContractor: Tideland |
Charleston, South Carolina
Electrical Line Bore 24" casing, 265' Method: GBM Contractor: MC Dean Contractors |
|
We have extensive experience in hand mining, boreshead, conventional auger boring and pilot tube boring. We do turn-key operations from digging the bore pit, supplying the casing to installing your carrier pipe if requested.
|